About the Project
Expansion of an existing water treatment facility including increasing water storage by installing a 560m3 below grade cast-in-place concrete reservoir. Installation of new pump house building and raw water line including shoring to facilitate excavation next to lake shore, tunnel to install new raw water line between new and existing pump house, precast 35′ deep dry well with steel access platforms, slope reconstruction and stability with engineered backfill, riprap and retaining wall
- Consultant: AECOM
- Location: Dillon, SK
- Project Value: $6.8m
- Delivery Method: Stipulated Sum