Construction Included a new below grade concrete reservoir (430m3), wastewater & backwash tanks. Above, a 208m2 structural slab was placed and covered with a wood framed structure.
Inside, the building will house the new biofiltration treatment system, membrane treatment unit, process pumps, chemical treatment systems and electrical systems. New underground services to existing system and improvements made to the new well pumps.
- Owner: Town of St. Brieux
- Location: St. Brieux WTP
- Project Value: $4.6M
- Delivery Method: Stipulated Sum